Introduction
A monthly subscription brand was paying premium per-order rates at a generic 3PL that didn't understand cycle planning. Switching to Launch's subscription-specific operations cut per-order costs 23% in the first quarter — while accuracy improved from 94% to 99.7%.
This case study is a Sprint 6 stub. Full client narrative + interview quotes + before/after metrics ship in Q3 2026 as we work through the editorial backlog.
The challenge
Detailed challenge breakdown shipping in Q3 2026 — interviews with the client team are scheduled.
How we approached it
Approach narrative shipping in Q3 2026.
The outcome
23% cost reduction — full metrics + verifiable data shipping in Q3 2026 alongside client signoff on quotes and figures.